Westdc Logo

WATER: Dataset of setting of the sampling plots and stripes in the Linze grassland foci experimental area Chinese Version


The dataset of setting of the sampling plots and stripes in the Linze grassland foci experimental area from May to Jul. 2008 list as follows:

Plots A (reed), B (saline), C (saline), D (alfalfa), E (barley) and H were set according to the spatial resolution of each overpass sensor. 49 points at intervals of 60m were located in each of the first five plots (360m×360m) and numbered such as A01. In order to synchronize with ASAR, PALSAR, ASTER and airborne OMIS and WiDAS, subplots of 120m×120m were arranged in A, B, C, D and E, and the points in these subplots were chosen at intervals of 30m. As for plot H (1.8km×1.8km), there were 64 points at intervals of 250m to synchronize with MODIS. Besides, there were still seven sample lines (200m from one to another), with 25 points at intervals of 100m each (L3-11 indicating No. 11 sample point along L3); and two PR2 plots (3Grid×3Grid) with points numbered like PR11 at intervals of 30m and two PR2 lines (11 points). All coordinates were archived in Excel format.


CitationHelp

Data Citation Huang Chunlin, Jin Rui, Wang Weizhen. WATER: Dataset of setting of the sampling plots and stripes in the Linze grassland foci experimental area. Cold and Arid Regions Environmental and Engineering Research Institute, Chinese Academy of Science. 2008. doi:10.3972/water973.0269.db


Special Publications

  1. Li X, Li XW, Li ZY, Ma MG, Wang J, Xiao Q, Liu Q, Che T, Chen EX, Yan GJ, Hu ZY, Zhang LX, Chu RZ, Su PX, Liu QH, Liu SM, Wang JD, Niu Z, Chen Y, Jin R, Wang WZ, Ran YH, Xin XZ, Ren HZ. Watershed Allied Telemetry Experimental Research. Journal of Geophysical Research, 2009, 114(D22103), doi:10.1029/2008JD011590.Detail | Download
  2. Wang Liangxu, Wang Shuguo, Ran Youhua. Data Sharing and Data Set Application of Watershed Allied Telemetry Experimental Research. IEEE Geoscience and Remote Sensing Letters, 2014, 11(11):2020-2024. doi:10.1109/LGRS.2014.2319301Detail | Download
  3. Li X, Li XW, Roth K, Menenti M, Wagner W. Preface 'Observing and modeling the catchment scale water cycle'. Hydrology and Earth System Sciences, 2011, 15(2): 597-601. doi:10.5194/hess-15-597-2011.Detail | Download

Cited By

  1. Ma, J., Song, X., Li, X., Leng, P., Li, S., Zhou, F., 2013. Estimation of surface soil moisture from ASAR dual-polarized data in the middle stream of the Heihe River Basin. Wuhan Univ. J. Nat. Sci. 18, 163–170.Detail

Limitations

The dataset is generated from the "Watershed Airborne Telemetry Experimental Research (WATER) “, the user must have a clear statement in the article of the original data source and adopt the reference style providing by the metadata in the References section.

Fund

  • The CAS (Chinese Academy of Sciences) Action Plan for West Development Project (No. KZCX2-XB2-09)
  • National Program on Key Basic Research Project (973 Program) (No. 2007CB714400)

Online Resources



InformationFile list

  • Size: 0.32MB
  • Downloaded: 24
  • Viewed: 9582
  • Temporal Range: 2008-05-23 to 2008-05-23
  • Sharing: Online

Google Maps


Contacts


  • Last update: 2011-10-24
  • Download Metadata: Adobe PDF OpenOffice odt Word doc XML